ZHENGYANG MACHINERY EQUIPMENT Co.,Ltd.

NewsHome>>News

Work process of CE Approved 99% recycling rate copper wire granulator and separator made in china

Author:Suny Group

Work process of CE Approved 99% recycling rate copper wire granulator and separator made in china 

Please make sure all the machines and electrical equipments are in good condition. Then start the machine, and keep the machine running unloaded for 5-10 minutes before feeding.
Attention:
Boot sequence: suction fan1→suction fan 2→blower-feeding blower →riddler→mainframe.
Shutdown sequence: Riddler→blower→suction fan1→suction fan 2→feeding blower→mainframe
Feeding
Before feeding, pick up the debris especially the iron from the wires in case of the damage to the crusher blades. During the feeding period, the feeding speed should be in accordance with the crushing speed.
Fine crushing
If there is any abnormal noise, please stop and check the crusher, or change different size screen.
If there is too mach copper or the produced particles are relatively small during the production process, replace the screen and adjust the distance between the fixed knife and the moving one.
If the machine is easy to overheat, stop the device and inspect the gearing.
Vibrating separator
After crushed, the mixed material will be delivered to vibrating device. The copper from vibrating separator is complete copper without plastic, while the copper clad from the opposite discharging hole needs the second crushing.